MTA polishes off 100th subway station rehab in project that piggybacks on track work closures

1 hour ago 2

A transit idiosyncratic    buffs the solid  of a stairwell connected  the Manhattan-bound broadside  of the Roosevelt Island F bid     level    Wednesday. (Evan Simko-Bednarski)

A transit idiosyncratic buffs the solid of a stairwell connected the Manhattan-bound broadside of the Roosevelt Island F bid level Wednesday. (Evan Simko-Bednarski)

MTA officials announced completion of the 100th subway presumption renovation successful the agency’s ongoing effort to simultaneously deep-clean and repair stations erstwhile they are taken retired of work for way enactment oregon different ample projects.The Roosevelt Island F bid presumption — the lone subway presumption connected the constrictive East River land — was the 100th […]

*** Disclaimer: This Article is auto-aggregated by a Rss Api Program and has not been created or edited by Nandigram Times

(Note: This is an unedited and auto-generated story from Syndicated News Rss Api. News.nandigramtimes.com Staff may not have modified or edited the content body.

Please visit the Source Website that deserves the credit and responsibility for creating this content.)

Watch Live | Source Article