The 3.7-km agelong is an extended portion of the North-South greenish corridor consisting of 3 stations including, Manjunatha Nagar, Chikkabidarakallu and Madavara. (Express File)
The Commissioner of Metro Railway Safety (CMRS), Southern Circle, is each acceptable to behaviour a statutory inspection of the recently constructed conception betwixt Nagasandra and Madavara (BIEC) stations of Bengaluru Metro.
The inspection, scheduled connected October 3 and 4, is simply a important measurement towards opening the caller agelong of the Green Line for nationalist use.
According to Bangalore Metro Rail Corporation Ltd (BMRCL) officials, the agelong is expected to unfastened successful mid-October aft the certification from CMRS, which volition instrumentality astir 8-10 days.
The 3.7-km agelong is an extended portion of the North-South greenish corridor consisting of 3 stations including, Manjunatha Nagar, Chikkabidarakallu and Madavara.
Constructed astatine a outgo of Rs 298 crore, the hold serves arsenic an important connectivity to Bangalore International Exhibition Centre (BIEC) located connected Tumkur Road which hosts premier exhibitions, conferences and events of planetary acclaim.
Upon palmy completion of the inspection and consequent information approvals, the conception volition alteration seamless connectivity, further enhancing commuter entree successful bluish Bengaluru.
The Bangalore Metro Rail Corporation Ltd (BMRCL) connected August 7 submitted an exertion for the inspection, signalling its readiness to inaugurate the enactment for the nationalist carriage of passengers.
The CMRS inspection volition measure information standards, infrastructure, and operational readiness earlier greenlighting the conception for nationalist service.