Just three years after installation, footpath railings at Bandstand removed

2 hours ago 1

bandstandAccording to erstwhile Congress corporator Asif Zakaria, the railings on the agelong had been installed successful May 2021, aft the civic assemblage executed improvement enactment connected the side-strip. (Representational Image)

In what has drawn flak from section residents, footpath railings on Bandstand’s B J Road — installed a specified 3 years agone — person precocious been removed to marque mode for the installation of marque caller railings. Amid locals calling it a “waste of expenditure”, the Brihanmumbai Municipal Corporation (BMC) has asked the postulation section to furnish details astir the contractor and the instructions issued for removal of the railings.

According to erstwhile Congress corporator Asif Zakaria, the railings on the agelong had been installed successful May 2021, aft the civic assemblage executed improvement enactment connected the side-strip.

However, earlier this month, the structures were dismantled by the contractor, overmuch to the grouse of the locals who maintained that the railings were hardly damaged.

Speaking to The Indian Express, Zakaria said the installation of the railings astatine Bandstand — alongside Carter Road — had travel adjacent aft locals opposed it. “We had opposed the railings adjacent during the installation, arsenic galore radical are incapable to entree the footpath due to the fact that of them. However, the BMC justified it by saying they were needed since the country clocks precocious footfall etc. The installation was carried retired by the roads section successful May 2021. And now, lone 3 years after, they person been removed,” helium said.

“The railings were successful perfectly bully condition. What was the request to instal caller FRP railings erstwhile the aged railings were hardly damaged and lone three-years old? This is simply a discarded of taxpayers’ money,” Zakaria added.

Festive offer

Meanwhile, elder BMC officials maintained that the enactment was executed by the postulation department. After visuals of the dismantled railings sparked outrage among locals, the ward bureau connected Thursday appealed to the postulation section to supply details astir the contract. “We person requested the postulation section to supply details astir the contractor concerned, erstwhile the railings were installed and whether instructions were issued for their removal. We are yet to person details from their end. Following our inspection of the details, we volition instrumentality further enactment connected the matter,” a BMC authoritative said.

© The Indian Express Pvt Ltd

*** Disclaimer: This Article is auto-aggregated by a Rss Api Program and has not been created or edited by Nandigram Times

(Note: This is an unedited and auto-generated story from Syndicated News Rss Api. News.nandigramtimes.com Staff may not have modified or edited the content body.

Please visit the Source Website that deserves the credit and responsibility for creating this content.)

Watch Live | Source Article