In December, the MHA had suggested that the wide complaint of the detention centre should beryllium fixed to the Home Department nether which the prisons successful Delhi besides fall.
A Revamped building, grooming jailhouse staff, coordination with information personnel, usage of technology, an summation successful manpower, and a amended drainage system: These are immoderate of the recommendations made by a committee formed by the Home Department to oversee the alteration of defender astatine the Lampur Detention Centre successful Delhi’s Narela, it is learnt.
The committee was formed aft the Ministry of Home Affairs asked the Home Department to instrumentality complaint of the detention centre and bring it nether the situation administration.
The six-member committee was formed successful the 3rd week of December aft which aggregate visits were made to the detention centre to oversee the issues for a amended understanding. The recommendations were submitted to the Home Department connected Monday.
In December, the MHA had suggested that the wide complaint of the detention centre should beryllium fixed to the Home Department nether which the prisons successful Delhi besides fall. The crushed down the determination was the similarity successful the quality of enactment and a much streamlined approach.
Currently, the Lampur Detention Centre is tally by the Social Welfare Department of the Delhi government, on with different agencies specified arsenic the Foreigners Regional Registration Office (FRRO) and the Central Reserve Paramilitary Force (CRPF), which is successful complaint of the information of the premises.
Once the Home Department decides connected the recommendations, the process to officially handover the complaint of the detention centre to the situation medication volition begin. Senior officials said it volition beryllium decided successful the coming months if the handover volition statesman first, oregon the execution of the recommendations.
“We made immoderate recommendations astir the authorities of the building, allocation of funds, and grooming of officials since our men are trained arsenic per Delhi Prison rules and for prisoners. The sewers are choked and the drainage strategy needs to beryllium improved. Technology is different facet that we are looking into,” said an authoritative who is portion of the committee. The authoritative added that the enactment would astir instrumentality three-four months.
The six-member committee includes an authoritative each from the Delhi Prisons, FRRO, Social Welfare Department, Home Department and Public Works Department (PWD).
At present, determination are 209 detainees astatine the centre, including Bangladeshis, Nigerians and immoderate Pakistanis. The centre is dispersed implicit an country of 18.5 acres. It was initially a beggar’s location which was converted into a detention centre. The gathering is successful a dilapidated information and is astir 50 years old.
Recently, L-G V K Saxena had besides issued directions to the Delhi Police to motorboat a crackdown connected amerciable immigrants, particularly Bangladeshis and Rohingya.
Discover the Benefits of Our Subscription!
Stay informed with entree to our award-winning journalism.
Avoid misinformation with trusted, close reporting.
Make smarter decisions with insights that matter.
Choose your subscription package