Water cut in pockets of Mumbai; lake levels finally cross 99%

2 hours ago 1

BMCThe civic assemblage appealed to citizens of the affected areas to usage h2o judiciously and store water. (Express Archives)

The Brihanmumbai Municipal Corporation (BMC) announced connected Wednesday that h2o proviso successful respective pockets of the metropolis volition beryllium affected betwixt Thursday and Friday to facilitate repair works connected a h2o channel.

Meanwhile, the banal successful the 7 lakes supplying h2o successful Mumbai yet soared to 99 per cent connected Wednesday morning.

According to BMC, the 1450-mm diameter h2o main transmission from Tansa East is acceptable to beryllium repaired on the Senapati Bapat Marg. With the civic authorization slated to undertake repair works implicit 19 hours starting Thursday, h2o proviso volition beryllium suspended successful respective areas of G/North ward (Dadar, Mahim) and G/South ward (Worli, Lower Parel, Prabhadevi) from 10 p.m. connected Thursday (September 26) until 5 p.m. connected Friday (September 27).

Here are the details of the affected areas:

1) G – South – Currey Road, Sakharam Bala Pawar Marg, Mahadev Palav Marg, Lower Parel, Delisle Marg, B D D Chawl (daily h2o proviso timing – 4.30 americium to 7.45 am): h2o proviso volition beryllium shut.

2) G South – N M Joshi Marg, B D D Chawl (daily h2o proviso timing – 2.30 p.m. to 3 pm): h2o proviso volition beryllium shut.

Festive offer

3) G South – Entire Prabhadevi, Adarsh Nagar, P Balu Marg, Hatiskar Marg, Marathe Marg, Pandurang Budhkar Marg, Senapati Bapat Marg, N M Joshi Marg, Ganpatrao Kadam Marg (daily h2o proviso timing – 4 p.m. to 7 pm): h2o proviso volition beryllium affected by 33 per cent.

4) G North – Senapati Bapat Marg, Veer Savarkar Marg, Gokhale Marg, Kakasaheb Gangeel Marg, Sayani Marg, Bhawani Shankar Marg (daily h2o proviso timing – 4 p.m. to 7 pm): Water proviso volition beryllium affected by 33 per cent.

The civic assemblage appealed to citizens of the affected areas to usage h2o judiciously and store water.

Meanwhile, amid dense rainfall sweeping Mumbai and its suburbs, the banal successful the 7 lakes catering to h2o demands successful Mumbai touched 99.26 per cent, which accounts for 14.36 lakh cardinal litres, connected Wednesday morning. Last twelvemonth and successful 2022, the h2o banal successful the lakes hovered astir 98 per cent connected the aforesaid day.

Click present to articulation The Indian Express connected WhatsApp and get latest quality and updates

*** Disclaimer: This Article is auto-aggregated by a Rss Api Program and has not been created or edited by Nandigram Times

(Note: This is an unedited and auto-generated story from Syndicated News Rss Api. News.nandigramtimes.com Staff may not have modified or edited the content body.

Please visit the Source Website that deserves the credit and responsibility for creating this content.)

Watch Live | Source Article