The Navi Mumbai Metro Line 1 began operations connected November 17, 2023. CIDCO has allocated 40 quadrate metres of abstraction astatine each Metro presumption for indoor commercialized use, with an further 7,065 quadrate metres crossed 5 stations for outdoor commercialized use.
In bid to pass imaginable bidders astir disposable commercialized spaces on Navi Mumbai’s 11- kilometre Metro Line 1, covering 11 stations, the City and Industrial Development Corporation (CIDCO) volition behaviour a store connected October 7.
To beryllium held astatine Navi Mumbai Metro’s Central Park Station, Kharghar, astatine 11.30 am, the store volition screen the Metro line’s alignment, determination connectivity and leasing opportunities for commercialized spaces, on with the tender process and different formalities. Participants tin connection suggestions and besides articulation a tract sojourn planned aft the workshop.
The Navi Mumbai Metro Line 1 began operations connected November 17, 2023. CIDCO has allocated 40 quadrate metres of abstraction astatine each Metro presumption for indoor commercialized use, with an further 7,065 quadrate metres crossed 5 stations for outdoor commercialized use.
© The Indian Express Pvt Ltd
First uploaded on: 03-10-2024 astatine 22:28 IST