Mumbai's 1st underground Metro stretch from BKC to Aarey opens for public

2 hours ago 1

Mumbai's archetypal underground Metro corridor, the aqua line's phase-1, stretching from Bandra-Kurla Complex (BKC) to Aarey became operational for the nationalist connected Monday morning.

A ample fig of radical came to acquisition the thrust connected the archetypal time of the BKC to Aarey agelong of Mumbai Metro Line 3.

The Metro cognition connected the agelong commenced for the nationalist astatine 11 am, amid cheers from passengers.

Prime Minister Narendra Modi connected Saturday inaugurated the 12.69 km agelong phase-1 of the BKC to Aarey agelong of Mumbai Metro Line 3.

He travelled from BKC to Santacruz and backmost during which helium interacted with students, beneficiaries of the Maharashtra government's Ladki Bahin strategy and labourers progressive successful constructing the underground line.

The Mumbai Metro Rail Corporation (MMRC), which is executing the 33.5-km-long Colaba-SEEPZ-Aarey JVLR project, has already notified that the regular cognition of the Metro connected the aqua enactment volition commence from Tuesday.

As per the notification, services volition beryllium operated from 6.30 americium to 10.30 p.m. betwixt Monday and Saturday, and from 8.30 americium to 10.30 p.m. connected Sundays.

The minimum fare for a thrust connected the Metro enactment is Rs 10 and maximum Rs 50, arsenic per the MMRC.

Passengers tin publication tickets utilizing the NCMC (National Common Mobility Card), Mumbai Metro 3 mobile app, and summons vending machines, among different means.

The corridor betwixt BKC and Aarey roadworthy has 10 Metro stations - BKC, Bandra Colony, Santacruz metro, Chhatrapati Shivaji Maharaj International Airport (CSMIA) T1, Sahar Road, CSMIA T 2, Marol Naka, Andheri, SEEPZ, Aarey Colony JVLR. Of these, lone Aarey JVLR presumption is astatine a people portion each others are underground.

The aqua enactment is the 4th Metro corridor of Mumbai.

The Ghatkopar-Andheri-Versova Metro Line-1, Andheri West-Dahisar Line-2A and Andheri East-Dahisar Line-7 are already operational successful the city.

*** Disclaimer: This Article is auto-aggregated by a Rss Api Program and has not been created or edited by Nandigram Times

(Note: This is an unedited and auto-generated story from Syndicated News Rss Api. News.nandigramtimes.com Staff may not have modified or edited the content body.

Please visit the Source Website that deserves the credit and responsibility for creating this content.)

Watch Live | Source Article