BMC Budget prioritises strengthening water supply network, revives Gargai dam project scrapped by MVA govt

2 hours ago 1

bmcThe BMC has brought backmost the Gargai Dam task which was scrapped aft the Maha Vikas Aghadi (MVA) authorities came to powerfulness successful 2019. (Express File Photo)

Strengthening the city’s h2o proviso infrastructure is among the cardinal absorption areas of the Brihanmumbai Municipal Corporation’s (BMC) civic fund for the fiscal twelvemonth 2025-26. Water proviso web projects that person been connected the back-burner besides recovered their mode to the fund arsenic portion of the latest efforts.

The BMC has brought backmost the Gargai Dam task which was scrapped aft the Maha Vikas Aghadi (MVA) authorities came to powerfulness successful 2019. The civic assemblage has earmarked Rs 36 crore for this project. Pushed by Devendra Fadnavis during his archetypal stint arsenic main minister, the task was halted citing biology concerns arsenic it would entail felling 4.5 lakh trees.

“The preliminary engineering works are astir completed with astir requisite method clearances obtained. However, permissions from the Forest Department and Wildlife Board are awaited and thereafter tender volition beryllium invited for this work,” work the BMC’s budget.

The civic assemblage has allocated Rs 4,000 crore for the Water Supply Project (WSP) section of which Rs 2,270 crore has been earmarked for constructing h2o conveyance tunnels. These tunnels are meant to fortify the h2o proviso successful Mumbai metropolis and suburbs by improving the travel of h2o organisation and bridging the demand-supply gap.

At present, the BMC has taken up operation of a 5.5-km agelong h2o passageway betwixt Amar Mahal (Chembur) and Trombay and different 9.7-km agelong h2o passageway betwixt Wadala and Parel. The passageway betwixt Chembur and Trombay is expected to beryllium completed by September this year, portion the Wadala-Parel passageway volition beryllium completed by April 2026.

Festive offer

The BMC has besides acceptable speech Rs 100 crore for its ambitious desalination works task which was stalled past twelvemonth aft it failed to pull bidders.

© The Indian Express Pvt Ltd

*** Disclaimer: This Article is auto-aggregated by a Rss Api Program and has not been created or edited by Nandigram Times

(Note: This is an unedited and auto-generated story from Syndicated News Rss Api. News.nandigramtimes.com Staff may not have modified or edited the content body.

Please visit the Source Website that deserves the credit and responsibility for creating this content.)

Watch Live | Source Article